Bringing life to the ‘new world of work’ (NWOW)

Case study - ORES
When sustainable development objectives and collaborative work practices inspire architecture
Grasping the challenges of a contemporary society

Case study - CERA
Reinvesting in the city centre by transforming a heritage building into a contemporary and open institution
Applying the principles of the circular economy

Case study - PROJET U
How can we turn a disused building into a vibrant and successful public institution?
All our projects working
Vanden Tymple - Diestestraat
Description
Location
Liège
Client
IGIL
Description
Location
Hasselt
Client
CM Limburg
Partners
- Cordeel
- Imtech
- OMGEVING
- Studiebureau Riessauw
- Studieburo De Klerck
- Raco
- VC
Status
Ongoing
Area
16.500 m²
Description
Location
Liège
Client
Université de Liège
Partners
- SGI
- Air Consult Engineering
Status
In progress
Area
2.900 m²
Description
Location
Leuven
Client
Dialoog vzw
Partners
- STir
- 3E
- Lateral Thinking Factory
Status
In progress
Area
750 m²
Description
Location
Zellik
Client
Euro Pool Systems nv
Partners
- STABO
Status
In progress
Area
40.000 m²
Description
Location
Louvain-la-Neuve
Client
CPFB
Responsible
Sophie Laborde
Partners
- MATRIciel
- COSEP
- AAIA
Status
Completed
Area
800 m²
Description
Location
Saint-Martin-de-Belleville (France)
Client
Alp-Hôtel - résidence les Bellevilles
Responsible
Sébastien Jamar
Partners
- B.E.L
- Semaco
- Atelier5.9
Status
Completed
Area
6.000 m²
Description
Location
Liège
Client
Centre Hospitalier Chrétien asbl
Partners
- Greisch
Status
Completed
Area
13.500 m²
Description
Location
Kortrijk
Client
Universiteit Gent
Partners
- Macobo Stabo
Status
Ongoing
Area
2400
Description
Location
Borgloon
Client
BelOrta cvba
Partners
- STABO
Status
In progress
Area
9.000 m²
Description
Location
Aye
Client
IDELUX
Partners
- AirConsult
- GEI
Status
Ongoing
Area
2.000 m²
Description
Location
Gosselies
Client
Promethera Biosciences
Partners
- AirConsult
- SGI
Status
Ongoing
Area
1.000 m²
Description
Location
Sint-Lievens-Houtem
Client
Sint-Lievens-Houtem
Partners
- STABO
Status
In progress
Budget
REO Veiling cv
Area
4.000 m²
Description
Location
Vilvoorde
Client
Het Facilitair Bedrijf (Vlaamse Overheid)
Partners
- STABO
Status
Completed
Area
17.500 m²
Description
Location
Strépy
Client
ORES scrl
Partners
- Poly-tech
- Pirnay
Status
Completed
Area
8.000 m²
Description
Location
Sint-Truiden
Client
BAM Contractors nv
Partners
- STABO
Status
Completed
Area
4.000 m²
Description
Location
Vilvorde
Client
LITES nv
Partners
- BM Engineering
Status
Completed
Area
15.300 m²
Description
Location
Geel
Client
ONS
Partners
- STABO
Status
Completed
Area
1.250 m²
Description
Location
Nimy
Client
Centre Hospitalier Universitaire et Psychiatrique de Mons-Borinage
Partners
- ABEL
- Air Consult Engineering
Status
Completed
Area
3.000 m²
Description
Location
Kinshasa (DRC)
Client
Rawbank
Partners
- DOMOTEC
Status
Completed
Area
11.500 m²
Description
Location
Brussels (Anderlecht)
Client
Multipharma scrl
Partners
- Ellyps
- COSEP
Status
Completed
Area
500 m²
Description
Location
Rotselaar
Client
Danone Belgium nv/sa
Partners
- STABO
Status
Completed
Area
9.000 m²
Cera Headquarters
Description
Location
Brussels (Anderlecht)
Client
citydev.brussels
Partners
- STABO
Status
Completed
Area
5.200 m²
Description
Location
Gembloers
Client
Université de Liège
Partners
- SGI
- Air Consult Engineering
- MATRIciel
Status
Completed
Area
6.600 m²
Description
Location
Genk
Client
McDonald's Belgium nv/sa
Partners
- Infrabo
- DS Engineering
Status
Completed
Area
450 m²
Kop van Kessel-Lo
Description
Location
Sint-Katelijne-Waver
Client
BelOrta cvba
Partners
- STABO
Status
Completed
Area
3.000 m²
Description
Location
Gosselies
Client
SISE sa
Partners
- SGI
- Air Consult Engineering
Status
Completed
Area
5.500 m²
Description
Location
Roeselaere
Client
REO Veiling cv
Partners
- STABO
Status
Completed
Area
30.000 m²
Description
Location
Genk
Client
Ziekenhuis Oost-Limburg
Partners
- archiduk
- STABO
- VK
Status
Completed
Area
7.500 m²
Description
Location
Leuven
Client
Aktiefinvest cvba
Partners
- STABO
Status
Completed
Area
11.400 m²
Description
Location
Genk
Client
Ziekenhuis Oost-Limburg
Partners
- STABO
Status
Completed
Area
23.400 m²
Description
Location
Leuven
Client
OMEXCO nv
Partners
- STABO
Status
Completed
Area
900 m²
Description
Location
Verlaine
Client
Kuwait Petroleum
Partners
- GEI
Status
Completed
Area
1.600 m²
Description
Location
Sint-Katelijne-Waver
Client
Euro Pool Systems nv
Partners
- STABO
Status
Completed
Area
1.700 m²
Description
Location
Herfelingen
Client
Olympia nv
Partners
- STABO
Status
Completed
Area
5.500 m²
Description
Location
Leuven
Client
OCMW Leuven
Partners
- STABO
Status
Completed
Area
850 m²
Description
Location
Mechelen
Client
MUTO vzw
Partners
- K. Beeck
- STABO
Status
Completed
Area
725 m²
Description
Location
Leuven
Client
Universitair Ziekenhuis Leuven
Partners
- GAF
- STABO
Status
Completed
Area
52.500 m²
Description
Location
Wanze
Client
Commune de Wanze
Partners
- Blaffart-Ciplet
- Lemaire
- MATRIciel
- COSEP
Status
Completed
Area
5.200 m²
Description
Location
Leuven
Client
Materialise nv
Partners
- STABO
Status
Completed
Area
5.400 m²
Description
Location
Duffel
Client
Reynaers Aluminium nv
Partners
- STABO
Status
Completed
Area
20.000 m²
Description
Location
Tongeren
Client
De Lijn nv
Partners
- STABO
Status
Completed
Area
1.500 m²
Description
Location
Tienen
Client
Dexia Bank nv/sa
Partners
- STABO
Status
Completed
Area
4.500 m²
Description
Location
Londerzeel
Client
Dexia Bank nv/sa
Partners
- STABO
Status
Completed
Area
3.000 m²
Description
Location
Venlo (NL)
Client
Euro Pool Systems nv
Partners
- STABO
Status
Completed
Area
15.800 m²
Description
Location
Aische-en-Refail
Client
Kuwait Petroleum
Partners
- GEI
- MATRIciel
Status
Completed
Area
1.100 m²
Description
Location
Leuven
Client
IMEC vzw
Partners
- STABO
Status
Completed
Area
5.200 m²
Description
Location
Leuven
Client
TYCO nv
Partners
- STABO
Status
Completed
Area
8.500 m²
Description
Location
Thieu
Client
Kuwait Petroleum
Partners
- GEI
Status
Completed
Area
1.600 m²
Description
Location
Averbode
Client
DBOC vzw
Partners
- STABO
Status
Completed
Area
1.700 m²
Description
Location
Brussels (Woluwé-Saint-Lambert)
Client
Cora
Partners
- Cora Techniques
- Ingénieurs Associés
Status
Completed
Area
89.000 m²
Description
Location
Brussels (Woluwé-Saint-Lambert)
Client
Cliniques Universitaires Saint-Luc
Partners
- GEI
- COSEP
Status
Completed
Area
12.000 m²
Description
Location
Brussels
Client
Twin Squares sa
Partners
- RVR
- EDV
- Ingénieurs Associés
- Jean Delogne
Status
Completed
Area
90.000 m²
Description
Location
Drogenbos
Client
UCB sa
Partners
- GEI
Status
Completed
Area
8.500 m²